This study examines the redevelopment process and the problems faced by the developers of ten sites where housing is being built on previously developed land.
The areas of derelict and vacant land found in many towns and cities are a legacy of Britain's industrial past. All too often this land is forgotten, 'unused and unloved', possibly contaminated or suffering from other problems, such as inadequate access or lack of service infrastructure. In spite of these drawbacks this 'previously developed' land may be in locations where people want to live, close to employment and social amenities. It is also Government policy that this land should be reused for housing, in preference to greenfield development. Researchers from Sheffield Hallam University have examined the redevelopment process and the problems faced by the developers of ten sites. The study found:
The brief for this research was to look at how Government policies were applied in practice by housing developers and the problems they faced in reusing land, by examining a range of case studies.
Government policy is that most land contamination should be dealt with through the planning system, except where 'significant harm' or pollution of controlled waters is being or is likely to be caused. In such cases the regulators may take action unconnected to the planning regime under Part IIA of the Environmental Protection Act 1990 (the 'contaminated land' legislation).
The case studies demonstrate that contamination is an important issue that needs to be addressed at an early stage and show that the selection of suitable consultants and contractors is extremely important. One of the case studies illustrates how extensive contamination may be missed by an inadequate site investigation or one that is hindered by the presence of existing buildings and plant.
Site access is an important consideration; without adequate access the site is unlikely to be developable, even though it may be possible to resolve physical ground condition problems. In the case of a former cotton mill and bleach works, for example, problems with access contributed to the development being abandoned. Related to access problems are issues such as the closure of existing streets or the diversion of public footpaths, so as to ensure comprehensive redevelopment.
Even when landowners and occupiers are prepared to sell by agreement, site assembly may still be fraught with problems and may prevent comprehensive redevelopment from taking place. The iron works and petrol station site case studies, in particular, demonstrate the importance of protecting reclaimed development sites against the inward migration of contaminants from adjoining sites. Recontamination of the development site in this way may totally negate the work already undertaken, may create 'pathways' for contaminants to reach housing occupiers, services and structures, and is likely to result in the need for even more costly site treatment - hindered by the presence of the newly built homes.
In all of the case studies, the developers employed a suitably qualified consultant to undertake a preliminary assessment of the subject site in order to identify any possible hazards that might affect future development. In some cases, this desk study identified the principal site problems but in other cases the full extent of contamination and other difficulties, such as major underground structures, were only revealed by an 'intrusive' investigation (such as drilling bore-holes).
No ground investigation can guarantee to locate all contaminants that may exist within a site but the case studies demonstrate how developers can gain a good understanding of site conditions. A thorough investigation can assess, with a reasonable degree of certainty, the likelihood of any contamination being present, the nature of the contaminants themselves and the media in which they are located.
Several case studies, including a former dye works and a shipbuilding works, illustrate the importance of taking a number of samples, solid and liquid, from different parts of the site and at regular depths. The development team can use the preliminary site assessment undertaken by the environmental consultant to plan a cost-effective intrusive site investigation, which may combine both geo-technical and environmental requirements. This site investigation should locate possible contaminants with a reasonable degree of accuracy. In several of the case studies this information was used to design a site-specific remediation strategy that helped reduce the amount of waste material disposed of to landfill sites.
The results of the site investigation will be presented in a detailed report, which should provide a step-by-step account of the processes undertaken. The report should be of a non-technical nature in order that the developer and appropriate regulatory authorities may understand it. Current good practice and suggested best practice imply that, in order to achieve its purpose, the report must include information relating to the site history, sampling strategy, analysis of results, maps showing trial-pit and bore-hole locations, site profiles, remediation strategies and a set of summary conclusions. Most of the case study site reports supplied to the researchers met these criteria but a small number were inconclusive, failing to provide adequate advice to the intending developer. These reports would also have been of little use to future purchasers.
Various options exist for remediating different types of contamination. These include:
These broad groups cover many different techniques (the research report describes several briefly, with references to more detailed source material). Selecting the most appropriate options will often have a significant impact on the viability of a housing development.
The choice of remediation method may be influenced by a number of factors:
For most, if not all, of the developers on the case study sites, cost and speed of completion were the main drivers in the selection of remedial methods. Development of sites in built-up areas may preclude the use of treatment methods that involve large production of dust, noise and/or odours; this was a particularly important consideration on a former petrol station site, for example. All of the case study site developers used 'tried and tested' site remediation methods and, in all of the cases studied for inclusion in the report, there was little evidence of 'innovative' treatment methods even being considered.
The ten case studies included eight where the development had already been completed or was underway at the time of the research, one that had not started and one that had been abandoned by the intending developer. The previous site uses, remediation methods employed, housing types, site sizes and contaminants were:
The research identified eleven distinct phases in the redevelopment of previously used land, leading to conclusions and recommendations relating to each phase. The principal findings for each phase were:
Project inception - several case studies confirmed the importance of developers and regulators adopting a flexible approach in order to achieve the redevelopment of 'previously used' or 'brownfield' land and buildings.
Site acquisition and site assembly - one of the studies, a former bleach works, illustrated the fact that whilst landowners may have unrealistic ideas about the value of their land, they may be trapped by historic valuations and by the land being used as collateral against loans.
Site assessment - The case studies demonstrated that all site assessments benefited from an historical study followed by an on-site investigation.
'Contaminant-pathway-receptor' - The case studies proved that it may not be necessary to remove all contamination from the site but it may be feasible to break or remove the 'pathway' instead. This implies that in preparing a conceptual model for assessing the site, all possible linkages should be considered.
Detailed design - once the site has been investigated, developers and planners need to be prepared to consider alternative remediation strategies and different layouts.
Feasibility study - having completed the site assessment and having identified all potential pollutant linkages, the revised design should be the subject of a comprehensive review by the development team.
Planning and regulatory approvals - the case studies show that close liaison with the regulators during the earlier phases will help ensure that the necessary information has been collected and can be presented in support of the applications.
Development finance - banks and other financial institutions are more prepared to provide development finance for 'previously used' sites than they were a few years ago.
Tendering - the appointment of contractors with experience of site remediation can be beneficial, as they may be able to suggest ways of undertaking the work.
Construction - all of the case studies (where work had been completed) confirmed the importance of ensuring that the site remediation/preparation works are properly supervised and fully recorded - including photographic and written records.
Sales and marketing - developers differed in their approach to what information was provided to prospective purchasers and tenants. Some, as in the landfill site, produced a fairly comprehensive statement of site history and site preparation works, making this available to purchasers and tenants. There was no evidence that this deterred potential residents and the development was over-subscribed. Others preferred to rely on providing information as part of the package of documents sent to purchasers' solicitors. On the whole, the developers recognised the importance of being open with information relating to the site and its development, as they felt any attempt at concealment was likely to have an adverse effect once it was discovered.
The study examined ten case studies geographically distributed throughout England to illustrate the redevelopment process and highlight some of the problems faced by developers when tackling 'previously developed' land. The sites were previously used for differing purposes and various methods were employed for site remediation. The new developments included social housing, shared ownership tenure, apartments and executive homes. The researchers reviewed the site investigation techniques and reports, discussed the development with the developers, town planners, environmental consultants, architects and engineers. The procedures employed in developing the sites were reviewed against current good practice, guidance and legislation, before being distilled into a brief description of how the redevelopment of each was tackled.
The lessons learned from the case studies were set into a framework of eleven phases of redevelopment. For all of the case studies, the researchers used a 'contaminant-pathway-receptor' risk model, where the contaminant (or source) relates to a substance or group of substances with the potential to cause harm. The receptor (sometimes referred to as the target) is someone or something, such as buildings, crops or animals, that could be harmed by the contaminant and the pathway is the route, for example the air, soil or water, through which it could reach the receptor.